On December 12, 2023, a day of great significance, Daume, renowned for its outstanding technical strength and excellent reputation in the field of industrial automation, actively participated in the machine pipeline renovation project of Xilaifeng LNG Plant under Shanghai Kaimeng Electronic Technology Co., Ltd. This project was a crucial attempt for Xilaifeng LNG Plant to enhance production efficiency and drive technological innovation, and Daume’s involvement injected strong impetus into its successful implementation.
As a key production base in the industry, Xilaifeng LNG Plant had long faced a series of complex and intractable issues in its machine pipeline system. The traditional pipeline control methods struggled to meet the growing production demands. Precise and efficient control of flow, pressure, and time was difficult to achieve, which not only affected the stability and continuity of production but also increased production costs and safety risks to a certain extent. These problems had long hindered the further development of the plant, acting as significant obstacles.
After thoroughly understanding the plant’s actual situation and requirements, Daume, leveraging its strong R & D capabilities and extensive project experience, customized a comprehensive and highly targeted solution for this project. The core measure of the plan was to replace all the main nodes of the pipelines with Daume’s meticulously designed energy storage multi-functional intelligent actuators.
This energy storage multi-functional intelligent actuator embodies the wisdom and efforts of many Daume researchers. It is an innovative product integrating advanced energy storage technology, intelligent control algorithms, and precise mechanical design. It features outstanding performance and powerful functions. It can accurately achieve flow control, ensuring that the fluid in the pipeline is transported at a stable and production-demand-compliant flow rate under different production conditions. It can also precisely regulate pressure, effectively preventing damage to the pipeline system caused by excessive pressure fluctuations and ensuring the safety and stability of the production process. Moreover, it realizes the function of time control. Through intelligent time setting and control, it can automatically adjust the operating state of the pipeline according to the production plan, greatly improving the planning and flexibility of production.
During the project implementation, Daume assembled an elite team composed of senior engineers and professional technicians. With a rigorous work attitude and excellent professional skills, they advanced all tasks in an orderly manner. From the early-stage on-site investigation and plan formulation, to the mid-stage equipment installation and debugging, and then to the later-stage system testing and optimization, every link was strictly supervised to ensure that each energy storage multi-functional intelligent actuator could be perfectly integrated into the pipeline system and perform at its best.
Through the joint efforts of Daume’s team and Shanghai Kaimeng Electronic Technology Co., Ltd., the energy storage multi-functional intelligent actuators were successfully installed and put into use. The actual operation results were remarkable, with all functions meeting or even exceeding expectations. The precise control of flow, pressure, and time made the plant’s production process smoother and more efficient. The long-standing production problems that had plagued the plant were completely resolved. Production efficiency increased significantly, product quality became more stable, and at the same time, safety hazards caused by equipment failures and human operation errors were reduced.
The success of this cooperation not only brought remarkable economic and social benefits to Xilaifeng LNG Plant but also further demonstrated Daume’s leading position and strong strength in the field of industrial automation. Daume has proven its technical advantages and innovation capabilities with practical actions, providing valuable reference experience for similar projects in the industry and laying a solid foundation for in-depth cooperation with more enterprises in the future.